Friday 14 January 2011

Session 1

In our first session we got given a A3 sheet which was a schedule of 2 weeks, this is where we filled in what we would be doing daily in each session, whether it was to film or to edit.

I have wrote the first ideas in black pen on what we are doing on the first week each day. Everyday had changed towards the end as there was some change of locations and that we couldn't go to that location and also that my other members of team was not there when we was meant to be filming. So we had to change the time we were filming.
This schedule shows what we are going to do everyday and it would help us so we were more organised and ready to film.

We filled in our first equipment booking form which we filled in so we can book out the equipment we need when we are wanting to film.

On the equipment booking form, we have to fill in when we are going to pick up the equipment and when we are going to return the equipment. There then is a list of equipment that is available, we put a tick next to the equipment we need when we are filming. Steve then checks the equipment we have booked out from checking the battery is charged and the shoe on the tripod to seeing if the stills camera is charged and there is a USB lead.

In most sessions we would have a team meeting and we would be given a sheet on what we have talked about in that meeting.

We have to write what meeting we were in and the date and time, who was present at the meeting and what has been talking about. In the first meeting we have decided the roles what me and my team were playing. I was the Director and the camera person.
We also talked about the different locations that we were going to film and what props and equipment that we will be needing in that location.

No comments:

Post a Comment